Facebook
Due to having such a heavy work load from the start of 2018 we’ve been a little …
[ad_1]
Due to having such a heavy work load from the start of 2018 we’ve been a little slack on our Fb post’s! So I’ll start off with some of the builds that have well in progress.
We have been given the task of a complete ground up build of this rx2, we have upgraded the diff, brakes, added a roll cage, custom door cards, seat brackets and a nice naturally aspirated 13b bridge port, radiator/oil coolers and new fabricated exhaust system. Next on the list will be a new injected fuel setup?
[ad_2]
Source